Hunan Hongjian Biotechnology Co., Ltd. Environmental Impact Assessment Public Participation First Publicity
Release time:
2023-03-16
According to the relevant provisions of the "Interim Measures for Public Participation in Environmental Impact Assessment" (HF [2006] No. 28) issued by the State Environmental Protection Administration, public participation surveys must be conducted for construction projects that may have a significant impact on the environment. The relevant information on the environmental impact assessment of the Phase II project of Hunan Hongjian Biotechnology Co., Ltd.'s annual production of 1000 tons of flavonoids and other health products and cosmetics raw materials production base is now publicly disclosed.
According to the relevant provisions of the "Interim Measures for Public Participation in Environmental Impact Assessment" (HF [2006] No. 28) issued by the State Environmental Protection Administration, public participation surveys must be conducted for construction projects that may have a significant impact on the environment. The relevant information on the environmental impact assessment of the Phase II project of Hunan Hongjian Biotechnology Co., Ltd.'s annual production of 1000 tons of flavonoids and other health products and cosmetics raw materials production base is now publicly disclosed.
1、 Basic information of the project
Project Name: Phase II Project of the Production Base for Health Products and Cosmetic Raw Materials with an Annual Output of 1000 tons of Flavonoids
Construction unit: Hunan Hongjian Biotechnology Co., Ltd
Construction location: No. 006 Shanyan Road, Jiashan Street, Jinshi High tech Industrial Development Zone, Jinshi City
Project Overview: The total construction area of Phase II is 4257m2. The second phase of construction includes a refining workshop and a laboratory inspection center. Consisting of a refining workshop and a laboratory inspection center, the first phase of the project includes a joint factory building, drying workshop, raw material warehouse, distribution room, power center, storage tank area, environmental protection engineering, and office facilities. The second phase of the project includes three project products: dihydroxyacetone, resveratrol, and niacinamide.
2、 The working procedures and main work contents of environmental impact assessment
The Environmental impact statement of the project mainly adopts the methods of data research, environmental monitoring data, model calculation and statistical analysis. During the preparation, according to the principle of up to standard discharge, focusing on the environmental impact assessment of waste gas and waste water, it puts forward technically feasible, economically reasonable pollution prevention measures, predicts and evaluates the scope and extent of the impact of the discharged pollutants on the environment during and after the construction process, and carries out public participation, Widely solicit public opinions, prepare the above contents into a Environmental impact statement, and then submit it to the administrative department of environmental protection for review and approval.
3、 Main matters for soliciting public opinion
The public can provide opinions on the following issues:
1. What is your understanding of the project situation through information disclosure?
2. What are the environmental issues that you are most concerned about during the project construction and operation period?
3. Do you have any suggestions, opinions or requirements for environmental protection measures during the construction and operation of this project?
4. Do you agree to the construction and operation of the project in the area? If you do not agree with the construction and operation of the project, please explain the reasons and provide your suggestions.
5. Do you have any opinions or suggestions on the environmental impact assessment of this project?
4、 The main way for the public to provide opinions or suggestions
You can provide your feedback within 10 days by calling the contact number, sending a fax, or email.
Construction unit: Hunan Hongjian Biotechnology Co., Ltd
Contact person: Mr. Xiong Tel: 13907369002
Hunan Hongjian Biotechnology Co., Ltd
March 16, 2023